Flateland Hydropower Plant
Flateland is a hydropower plant located in Agder County in southern Norway, with a small reservoir capable of storing water for approximately two days. The hydropower plants was completed in 2024, and Suomen Voima owns approximately 90 % of it. The hydropower plant was added to Suomen Voima’s portfolio as a greenfield project. The power station has a head of 150 metres and an annual electricity generation of approximately 47 GWh.

